Road closures in Seven Sisters/West Green Road
Cadent Gas has begun a major project to improve the reliability of its network. There will be road closures from May to September 2024. See all details about the major roadworks project.
Under the Highways Act 1980, you must have a dropped kerb (vehicle crossover), if you want to drive over a pavement to park in your driveway. A dropped kerb is a sloped area where the vehicle crosses from the road to the driveway.
All dropped kerbs are built by our highways maintenance team.
Complete the online application for a dropped kerb.
If you have planning permission, we will need the reference number and date.
Read our dropped kerb (vehicle crossover) guidance notes before making your application.
The cost of a dropped kerb depends on:
Average cost of construction | £2,700 |
---|---|
Lowest cost of construction | £1,550 |
Highest cost of construction | £16,000 |
Engineer inspection | £397 |
The engineer inspection may identify utilities that must be moved, for example water pipes. If this happens you must separately contact the utility company to arrange this. You will also be responsible for any charges that are incurred.
When we get your application we will:
When the work has finished, if the costs are: